On a residential development the client is the developer or the main contractor, not the resident, and that changes what matters. Repeatability across many identical units, plot by plot handover, and acoustic compliance all outrank the appearance of any single floor.
What the flooring has to cope with
Impact sound between dwellings is the constraint that shapes everything. Approved Document E sets what has to be achieved between flats, and the floor build-up is a large part of achieving it, so the covering, the resilient layer and the perimeter detail get specified together rather than separately.
Then the split between units and communal areas. A shared corridor or lobby takes several times the traffic of any apartment inside it, and specifying both the same way means replacing the communal floor years early.
Working plot by plot
- Rolling programmes matched to plot releases rather than to whole blocks
- Consistent details across units so snagging is predictable, not exploratory
- Protection held until practical completion, through following trades
- Moisture testing per plot, because slabs dry at different rates in the same block
- Communal areas specified and handed over on their own timeline





