Most floor failures start with what is underneath. We survey, test and prepare substrates so the finish that follows bonds properly and stays down, whether it is part of our own installation or a package on its own.
What we provide
- Floor and substrate preparation, including smoothing and levelling
- Mechanical preparation and removal of laitance, adhesives and coatings
- Moisture testing and damp proof membrane systems
Every job starts with finding out what the substrate actually is, so the method is chosen for the floor rather than assumed.












