Moisture in a slab is one of the most common reasons a new floor fails. We test substrates before any covering goes down and, where readings are too high and the programme cannot wait, apply a surface damp proof membrane so the floor can be laid without delay.
What we deliver
- Moisture testing to BS 8203, with readings recorded
- Mechanical preparation to receive the membrane
- Liquid applied epoxy membranes at the specified coverage
- Smoothing compound over the cured membrane, ready for the finish
- Detailing at perimeters, upstands and penetrations











